Transco was expanding the existing Transco natural gas pipeline to connect Marcellus shale gas supplies with markets in the Mid-Atlantic and Southeastern United States.
Sands Decker provided site civil engineering design and surveying services for two new electric motor-driven compressor stations that were designed to increase natural gas deliveries.