Market:
  • Healthcare
Services:
  • Civil Engineering
  • Stormwater
  • Surveying

The project included a major expansion of the existing Bethesda Hospital campus. As a result, the Arlington interceptor sewer required relocation. Design documents meeting City of Zanesville criteria were prepared including a sanitary sewer plan and profile and associated details. The documents also included a Storm Water Pollution Prevention Plan (SWP3) in compliance with state and local regulations for sediment and erosion control during construction.